Home > Buy Now > Other Manufacturing & Processing Machinery > HDPE Chemical Pump
 


Negatron Co., Ltd.
 
icon Water Purifier (Oxygen Water)
icon FRP Pump
icon HDPE Chemical Pump
icon Nano Fresh water reducer
icon Micro Bubble Negative Ionized Oxygen Supplier
icon Digital Fisher Scale
icon Water Treatment System

line

icon Company Profile
icon Selling Leads
icon Index
icon Bulletin Board
icon Guest Book
icon e-Book

line



visitors: 40655
 
Contact us
Negatron Co., Ltd.
[Korea]
Address:
576-1 Hakjang-dong Sasang-gu Busan 617-846 Korea
Phone:
82-51-3250803
Contact name:
Dohyoun Cho , Manager
Inquire now









Negatron Co., Ltd.
 
HDPE Chemical Pump

HDPE Chemical Pump

Inquire now

HDPE Chemical Pump

Click to enlarge image

 Model Number NT4-NFC series

Application

  • Fine Chemical Industries
  • Petrochemical Industries
  • Pollution Control Industries
  • Shipbuilding Industries
  • Food Industries
  • Semiconductor Industries
  • Other Industries

Feature

  • This is the compress molding product made by superhigh pressure, 900kg/cm2( The forming equipment of P.E. pump's resin injection, Patent 0260774)
  • We have been making efforts to reduce defects and find a worldwide market.
  • This is high-efficiency product so, you can economize energy by using it.
  • Semi-Permanent Product
  • Cuts down the cost of production with a specialized method of construction. All parts are made of HDPE, so it has good corrosion resistance, acid resistance and abrasion resistance.
  • Proof against rust
  • All parts are made of HDPE, so it has good corrosion resistance, acid resistance and abrasion resistance.
  • Proof against rust

Specification

Capacity
0.05~7.5m3/min
Total Head
max 65m
Temperature
Max 75°C
Revolution
1750, 3500rpm 1450, 2900rpm
Rotation
CW(Clockwise viewed from coupling end)
Shaft sealing
Mechanical SealSIC/Carbon, Unbalance, Rubber:Bellows Type
Flange
KS 10kgf/cm2(JIS, 10kgf/cm2), FF Type
Bearing Lubrication
Oil bath Type
Bore
32~150mm

Selection Chart

Section Drawing-1

Sectional Drawing-2

Outline Dimensions

Deal Drawing

Precautions before using : Warning

  1. Please fix pump and motor with coupling. after confirming the motor's rotation direction is equal to it marked on the pumpIncorrect rotation direction causes damage of Impeller, Mechanical Seal and Casing Cover.
  2. Please start the pump after filling Casing with fluid.
  3. Please install a pipe-hanger which can support the weight of pipe laying. Please be careful lest pump should be damaged by external stress. in any case pay attention lest stress should reach to pump(Reference Figure D)

Example of piping




Inquire now